Wednesday, August 5, 2009



Finished the warre bee house today, well it still needs a coat of paint but all the structure is there. Fitted the runners for the rear sliding doors. There are two wide doors at the top and three sliding doors at the bottom. The bottom doors are to allow access to slide in a warre section underneath. The top doors are to allow access to fit the lifting gear onto each station. Now the whole thing is pretty bee tight so I will drill a small hole at the top under the roof overhang at each hive station to allow trapped bees out when I have done a manipulation. Here are a couple of photos which show rear doors and one of the front with the first 'porch' in place. The warre hive to the left of this will be transferred to this station in the near future.

No comments:

Post a Comment